Clean California Beautification Projects
District 1 Project Portfolio (Del Norte, Humboldt, Lake and Mendocino Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Central Boonville Beautification | Mendocino | 128 | Install art, cross-walks and street trees. |
Eureka Box Art Program | Humboldt | 101 | Funding for artists to paint utility boxes. |
Hoopa Downtown Beautification | Humboldt | 96 | Install hardscaping on planter islands, art, upgrade existing lighting for uniformity, install new lighting and utility pole art, and improving existing sidewalks. |
Berry Summit Vista Point Beautification | Humboldt | 299 | Install zero-emission vehicle (ZEV) charging station, construct pit toilet facilities, pavement removal, install picnic area, improve lighting, plant native, drought-tolerant vegetation, install informational kiosks and painted trash receptacles. |
Covelo Downtown Connectivity | Mendocino | 162 | Installl traffic calming features to beautify the Covelo's Main Street, reduce litter, and improve safety and conncetivity for non-motorized users. |
Orleans Community Enhancement | Humboldt | 96 | Install art, wayfinding, lighting and traffic calming features. |
Vance Parklet | Humboldt | 255 | Paved lot removed and replaced with a small park |
Samoa Bridge Murals | Humboldt | 255 | Install murals on bridge columns. |
District 2 Project Portfolio (Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama and Trinity Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Greenville | Plumas | 89 | Provide landscaping and irrigation along the state highway after Greenville is rebuilt. Replace trees lost due to the Dixie Fire. |
Safety Fencing | Shasta, Tehama | Var | Install fencing at various locations to restrict access to structures |
Gateway Monuments | Trinity Plumas | 299/36 | Install two gateway monuments in select communities on State Route (SR) 299 in Trinity County and two gateway monument along SR 36 in Plumas County in the town of Chester. |
Modoc Beautification Enhancements | Modoc | 139/395 | Install a gateway monument at each agriculture inspection building lane entrance. |
Susanville Gateway | Lassen | 36 | Install gateway monument and landscaping near the entrance of the City of Susanville. The project will beautify and improve public space in the vicinity of the highway through the addition of a permanent art installation. |
Yreka Beautification | Siskiyou | 3 | Install decorative lighting, planters, and textured sidewalks and crosswalks in the city of Yreka. |
District 3 Project Portfolio (Butte, Colusa, El Dorado, Glenn, Nevada, Placer, Sacramento, Sierra, Sutter, Yolo and Yuba Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
South Sacramento Beautification and Safety Connections | Sacramento | 99 | Remove and/or install slope paving and paint bridges. Install mulch and inert materials. |
Oroville Beautification and Safety | Butte | 70 | Install art, inert materials, and slope paving. |
Marysville Beautification and Safety | Yuba | 70 | Paint bridge structures, install decorative gore paving at ramps, install sidewalks, mulch, and inert materials, and add pedestrian lighting under bridge structures. |
Orland Clean CA | Glenn | 5 | Place inert material such as rock, gravel, or recycled glass at areas where there is no vegetation. Install artwork, slope paving and paving at narrow areas with enhanced beautification details at bridges. |
West Sacramento Beautification and Safety | Sacramento | 5, 51 | Install inert materials, metal art, aethetic fencing, and artistic painting on retaining walls. |
South Central Sacramento Beautification and Safety Connections | Sacramento | 99 | Install aesthetic fencing and art on bridge structures and pedestrian overcrossing strutures. |
Chico Beautification and Safety | Butte | 99 | Install artwork and aethetic slope paving. |
District 4 Project Portfolio (Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano and Sonoma Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Berkeley Roadside Planting | Alameda | 80 | Install planting, irrigation, gateway monument, aesthetics enhancements, rock blanket and a 3-year plant establishment period. |
SOMA Street Tree Nursery | San Francisco | 80 | This project proposes to convert a highly visible blighted parcel at the 5th St/SR-80 interchange to an active tree nursery and education center. Funded improvements would include ornamental security fence and gates, public art pieces, driveways and vehicle access, ground surface prep, and electrical and water service. The space would be utilized for growing and storing container plant material and hosting educational efforts. |
San Jose Art | Santa Clara | 680 | Clean up, modification or beautification of existing structures, lighting, enhanced paving, fencing, walls, inert material, green street elements, planters, planting/irrigation, signage or displays, public art installations such as murals or sculptures, improvement of public spaces in underserved communities, safety measures or alternative mode uses (ZEV Charging, transit stops, bike parking). |
Architectural Lighting of Bay Area Portals | Alameda Contra Costa San Francisco | 160, 24, 80 | This project will install architectural lighting of the Bay Area portals (Posey Tube, Caldecott Tunnel, Yerba Buena Island). The architectural lighting will be capable of colorful displays and/or white light that could be changed with seasonal interest. |
Oakland Roadside Enhancements | Alameda | 880 | Clean-up, aesthetics on walls and concrete barriers, enhanced paving, inert materials and planting, irrigation, and plant establishment. Delivery by job order contracting. |
San Jose Havana-Midfield Park | Santa Clara | 101 | The City of San Jose approached Caltrans for development of this unused Caltrans space into a pocket park for the community and Caltrans has implemented an airspace lease for this parcel with the City of San Jose. |
D4 Enhanced Infrastructure – Safety Enhancement Projects | Sonoma, Solano | 101, 37, 780 | Install safety measures at bridge structures including decorative security fencing, decorative paving, and natural rock groundcover. |
D4 Enhanced Infrastructure – Safety Enhancement Projects | Alameda | 980, 24 | Install safety measures at bridge structures including decorative security fencing, decorative paving, and natural rock groundcover. |
San Jose Almaden Beautification | Santa Clara | 280 | Install improved and new sidewalks, fencing, buffer planting areas between the sidewalk and street including street trees, and infrastructure features to facilitate creation of community gardens and safe storage for unsheltered individuals. |
D4 Enhanced Infrastructure – Safety Enhancement Projects | Contra Costa | 580, 80, 4 | Install safety measures at bridge structures including decorative security fencing, decorative paving, and natural rock groundcover. |
D4 Enhanced Infrastructure – Safety Enhancement Projects | San Mateo, Santa Clara | 101, 80, 84 | Install safety measures at bridge structures including decorative security fencing, decorative paving, and natural rock groundcover. |
San Francisco Potrero Hill Gateway | San Francisco | 101 | Provide enhancements to beautify and complement pedestrian/ bicycle use in the Portrero Hill neighborhood. Install decorative fencing, slope paving and pedestrian lighting. |
Richmond Art and Light | Contra Costa | 80, 580 | Install pedestrian scale lighting to brighten the pedestrian experience and artwork to help enliven the space for the community. Additional improvements include decorative paving, fencing and slope paving. |
Fairfield and Suisun Planting | Solano | 12 | Install low-water use plants, recycled water irrigation, plant establishment, community identification, fencing and inert groundcover. |
Oakland Enhanced Pedestrian Lighting | Alameda | 185 | Install pedestrian scale lighting to brighten the pedestrian experience and to help enliven the space for the community. This project will also install solar powered garbage cans. |
Vallejo – Bay-Vine Trail | Solano | 29, 37 | This project will fund enhancements to the Vallejo- Bay/Vine bike trail project. The project will provide entry monument signing on SR 29 near Enterprise Blvd and SR37 at Broadway Boulevard. In addition, the funding will install a concrete post and rail fence between the bike trail and adjacent Wilson Avenue within state right of way. Enhanced colored pavement at three locations will help to improve the experience for the trail users. |
District 5 Project Portfolio (Santa Barbara, San Luis Obispo, Monterey, San Benito and Santa Cruz Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Chumash Museum Highway Beautification | Santa Barbara | 246 | Install custom fabricated artist-designed fencing, foreground enhancement of the planned museum sign, landscape planting with only native plants and with recycled water which is available, improved directional and reservation signage, pedestrian access improvements with aesthetic elements. |
Castroville Historic Main Street Landmark Restoration | Monterey | 183 | Restore a valued iconic landmark, in keeping with the aesthetics of its historic ‘main street’ architectural setting, replace an old support structure determined to be long past its useful life and in need of replacement for safety, include mast arms for colorful banners to highlight planned community events contributing to local economic vitality, repair sign lighting (possibly convert to solar), include brick bulb- outs to match other complete streets elements in the corridor. |
Castroville Pedestrian Overcrossing Beautification project | Monterey | 156 | Clean and prime structure and fencing, add mural or other aesthetic treatment on bridge walls, seal with anti-graffiti coating, add drought tolerant shade trees, add inert ground covers/mulch to suppress weeds, improve sidewalk and crosswalk aesthetics, add street furniture. |
Hollister Pinnacles National Park Highway Beautification | San Benito | 25 | Plant shade trees and dense, colorful landscaping along pedestrian sidewalks and soundwalls, add street furniture, enhance sidewalk paving, add artistic bas relief elements on soundwalls highlighting neighborhood cross streets. |
King City Highway Beautification and Canal St Pedestrian Enhancements | Monterey | 101 | Paint soundwalls and seal w anti-graffiti coating, landscape along soundwalls, add rock blanket, low stone walls and inert materials to suppress weeds, install smart irrigation system, improve retaining curb and add decorative slope paving, add aesthetic treatment/artistic elements to structure. |
New Cuyama Carrizo Plain National Monument Highway | Santa Barbara | 166 | Establish a windrow of drought tolerant, signature shade trees along highway ‘main street’. Species to match local preference for seasonal spring flowers and fall color, install community identifiers, replace right-of-way fencing in poor condition with decorative wall, replaces wood Main Street fencing with more durable metal fencing with artistic accents appropriate to local history and native people of the region, upgrade an existing historic monument to improve its aesthetic setting and its outdated inequitable narrative content, add gateway monuments with aesthetic elements. |
Oceano Historic Main Street Parklet | San Luis Obispo | 1 | Close redundant side street and repurpose as a community meeting place and parklet, remove asphalt and add decorative paving, add decorative crosswalk, plant shady street trees and/or install shade structures, add planters for seasonal color, add street furniture and lighted bollards, create new community information kiosk, incorporate artistic elements, add pedestrian counter, add decorative low fencing. |
Salinas Alisal Vibrancy Neighborhood Beautification | Monterey | 101 | Clean or paint structure, revitalize existing murals, add new murals or other tile or metal artwork, seal w anti-graffiti coating, add aesthetic treatments to sidewalks, add street furniture and lighting, replace or remove RW fence, add signature skyline/shade trees, improve landscaping at corners, add inert materials or rock blanket. |
The San Juan Bautista Washington Street Bridge Structure | San Benito | 156 | Clean/paint structure, add mural on bridge walls, add decorative slope paving to fix erosion, replace worn out RW fencing, add shade trees, suppress weeds with rock blanket or inert materials or mulch. |
Atascadero Curbaril Park and Ride Lot Enhancement | San Luis Obispo | 101 | Improve landscape, add ZEV Charge Stations, restripe and repair AC as needed, repair RW fence, decorative bike locker and bollards, art elements on traffic boxes, art events on ZEV media screens. |
Santa Maria Historic Main Street Highway Beautification | Santa Barbara | 135 | Enhance crosswalks with custom aesthetic design, improve intersection corners with bulb outs and decorative sidewalks, improve paving and landscaping in existing medians, create landmark wayfinding artwork at key locations, add artwork sleeves on sign or signal posts, add eBike Charging, add 'smart' street furniture, add eco-pedestrian counters. |
Watsonville Historic Main Street Highway Beautification | Santa Cruz | 129, 152 | Revitalize exist landscape median planting by replacing poor condition plants, improving soil health, and applying decorative paving, rock blanket; make water-conserving irrigation upgrades; enhance exist sidewalk paving with colorful mosaic art; beautify existing retaining wall with paint or other aesthetic treatments; add signature street furniture; add free standing art and/or a gateway monument at community entryways and along the corridor. |
District 6 Project Portfolio (Fresno, Madera, Kings, Tulare and Kern Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
City of Arvin Median and Pedestrian Improvements | Kern | 223 | Enhance safety features for pedestrians with the improvement of current crosswalks and installation of new crosswalks; improvement aethetics of the existing medians and improve the visual character and identity of the city |
City of Avenal Enhancement | Kings | 269, 33 | Remove and replace vegetation; install radar feedback speed signs along SR 269 to enhance the safety of users along the corridor; install a gateway monument. |
Fresno Block Wall | Fresno | 41 | Install concrete masonry unit wall and drought tolerant plantings |
Kerman Roundabout Enhancement Project | Fresno | 145 | Removal and replacement of plantinginside and outside of the central island; install decomposed granite or rock blanket within the central island to reduce maintenance; revision of the existing irrigation system, repair of existing hardscaping, rock blanket paving along sidewalk edge; install gateway monument inside of the central island. |
Madera Block Wall Enhancement | Madera | 99 | Install oleander planting in front of the block wall to deter tagging; install a simple artistic design to further discourage tagging to the wall. |
McKinley Public Space Improvement | Fresno | 41 | Install a public gathering space; install street furnishings such as benches, fencing, planting, and irrigation; install sculptures created in partnership with local artists; convert the space into a community garden if approved; install planter boxes and a community building. |
Mendota and Firebaugh Beautification and Enhancement | Fresno | 33/290 | Install planting along the west side of SR 33 where irrigation is already in place; install a gateway monument; install sidewalk; install radar feedback speed limit signs; install rectangular rapid flashing beacons at marked crosswalks; install benches; add green paint to bike lanes. |
San Pablo Park Enhancement and Beautification | Fresno | 180 | Enhance and beautify existing structures in San Pablo Park located under SR 180 in Fresno; remove and replace vegetation; install additional trash containers; install new signage, improved fencing, and public art in partnership with local artists. |
Tulare Corridor Screening | Tulare | 99 | Enhance and beautify the SR 99 corridor in Tulare County for travelers along 99 and members of the communities; construct enhanced fencing and provide visual screening to decrease views of adjacent blighted areas; provide privacy screening for residents living adjacent to SR 99. |
City of Bakersfield – SR 204 Slope Paving, Sidewalk Gap Closures, and Artwork | Kern | 58/204 | Install murals underneath Caltrans bridge structures located along the corridor; removal and replacement of vegetation on slopes; improved fencing; sidewalk gap closures and remediation; green bike lane paintings; utility box art wrappings; red stamped concrete replacement in the medians rock cobble in gores; screen planting; free-standing sculptural pieces and rock work on slopes. |
Mural installation in the SR 41/California Ave/F St Airspace | Fresno | 41 | Enhance and beautify the airspace under SR 41 next to F Street in the city of Fresno; add a mural to the California Avenue abutment wall. |
Chowchilla Enhancement | Madera | 233 | Install new trees and vegetation; install tree wells and grates; install rectangular rapid flashing beacons at marked crosswalks; develop a new gateway monument for the city; median beautification along SR 233 corridor; quick build bulb outs; repair missing or damaged sidewalk sections |
Cutler-Orosi Corridor Enhancement | Tulare | 63 | Construct road diet including traffic calming elements such as bulb- outs which could be expanded to create small pockets of public space for artwork placement; install rectangular rapid flashing beacons at marked crosswalks; install accent and shade tree planting to reduce heat island effects; develop safe bike lanes to promote active transportation; incorporate streetscape furnishings including an aesthetic related family of streetscape elements such as benches, trash receptacles, bike racks, bus stop furnishings; accent paving in sidewalks at spot locations of interest; add free standing art and/or a gateway monument at community entryways and along the corridor. |
Garces Circle Improvements | Kern | 204 | Install improved fencing, curb ramps, new sidewalks, cobblestone paving, new seating, and murals; aesthetic fencing beneath bridges used as a safety enhancement to protect structure from potential fire; safety enhancements within the central space of the Garces Memorial circle with installation of rock blanket or similar in Caltrans right of way. |
MacFarland & Delano Enhancement | Kern | 99 | Create a new pedestrian trail system along the freeway for both the NB and SB frontage roads; install artwork and site appurtenances, benches, trash receptacles; reconstruct right of way fence; install slope paving beneath bridge |
Tulare Avenue and Divisadero Enhancement | Fresno | 41 | Install artwork in partnership with local artists; install rock blanket, and replace dead vegetation with drought tolerant plants. |
City of Bakersfield – SR 99/California Ave. Pedestrian Improvements | Kern | 99 | Install rock blanket; install decorative fencing; paint existing retaining wall and columns on bridge structures |
District 7 Project Portfolio (Los Angeles and Ventura Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
105 Willowbrook Trail | Los Angeles | 105 | Construct approximately 2,650 linear feet of walking paths. |
Downey Dollison Fitness Trail | Los Angeles | 5 | The project will provide connectivity to neighborhoods by constructing walking paths that lead to parks and schools. |
Soltice Canyon Creek Art Murals | Los Angeles | 1 | Install art mural on the new pedestrian underpass concrete walls. |
Lankershim Blvd to Beaudry Ave Beautification | Los Angeles | 101 | Install decorative rock design and California native planting; install artwork and new decorative colored concrete; replace barbed wire on overhead signs with more visually appropriate dimpled sleeves on columns; upgrade irrigation for water conservation and theft prevention |
Sun Valley - Paxton to Roscoe Blvd. | Los Angeles | 5 | Install wall fencing & vines; restore irrigation systems; stabilize eroding soil areas with decorative and/or colored RSP, rock blanket, stamped concrete & slope paving. |
10 and 60 Corridors Safety Enhancement | Los Angeles | 10, 60 | Upgrade/replace existing damaged fence; place rockscape at bridge abutments and abutment slopes; place metal cover at bridge openings to prevent access. |
Northwest LA Corridor Safety Enhancements | Los Angeles | 2, 101, 134, 170, 405 | Upgrade/replace existing damaged fence; place rockscape at bridge abutments and abutment slopes. |
210 Foothill Blvd Safety Enhancements | Los Angeles | 210 | Install/upgrade fence along EB 210 off ramp at Foothill Blvd and drainage easement; repair and regrade damaged slopes. |
North Hollywood Beautification | Los Angeles | 170 | Install rock cobble groundcover; install new decorative colored concrete to enhance existing artwork; install aesthetics on the chain link fence; paint bridge structures; remove barbed wire on overhead signs and replace with more visually appropriate dimpled sleeves on columns; install public dog park to Tiny Home Village. |
110 Imperial Highway - Adams | Los Angeles | 110 | Install trees, shrubs, ground covers to improve existing roadside conditions on Route 110. Vine planting will be provided to prevent graffiti. On and off ramps to communities will be enhanced with soft and hardscape design. |
Long Beach Signal Hill | Los Angeles | 405 | Install trees, shrubs, ground cover; install artwork with aviation theme. |
Soto St. to City Terrace Dr. | Los Angeles | 10 | Install trees, shrubs, ground covers; install vine planting on walls to prevent graffiti. |
5 and 118 Interchange Beautification | Los Angeles | 5, 118 | Install wall fencing & vines, restore irrigation systems, stabilize eroding soil areas with decorative and/or colored RSP, rock blanket, stamped concrete & slope paving. |
Simi Valley Beautification | Ventura | 118 | Install rock cobble groundcover; install native drought tolerant plants. |
Compton/ Paramount Beautification | Los Angeles | 710 | Install trees, shrubs, ground covers, art and art elements. |
North LA Corridors Safety Enhancement | Los Angeles | 5, 118, 210 | Upgrade/replace existing damaged fence; place rockscape at bridge abutments and abutment slopes. |
South LA Corridors Safety Enhancement | Los Angeles | 91, 110, 405, 710 | Upgrade/replace existing damaged fence; place rockscape at bridge abutments and abutment slopes. |
District 8 Project Portfolio (Riverside and San Bernardino Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Nipton Rd Gateway Monument | San Bernardino | 15 | Install one gateway monument identifying the State of California and one maintenance vehicle pullout (MVP). |
Needles Gateway Monument | San Bernardino | 40 | Install one gateway monument identifying the State of California; install low maintenance landscaping such as decorative gravel and boulders, rock blanket, pavement in gore areas, and maintenance vehicle pullouts. |
Blythe Gateway Monument | Riverside | 10 | Install one gateway monument identifying the State of California; install low maintenance landscaping such as decorative gravel and boulders, rock blanket, pavement in gore areas, and maintenance vehicle pullouts. |
San Bernardino Gateway Monument | San Bernardino | 18 | Install one gateway monument sign identifying State Route 18 as a gateway to the San Bernardino Mountains. |
State Line Gateway Monument | San Bernardino | 62 | Install one gateway monument identifying the State of California that will include artistic elements showcasing state themes, local context, and character. |
District 9 Project Portfolio (Inyo, Mono and Eastern Kern Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Mono County Beautification | Mono | 395 | The project will remove four existing MBGR systems and replace them with Natina stained MGS and end terminal systems. The existing systems were constructed to a prior standard and are the standard galvanized steel rail, of varying shades of weathering and damage. |
Rosamond Interchange Xeriscape | Kern | 14 | Install low maintenance and minimal water use xeriscape theme planting; install decorative artisitc rock formations of unique colors, sizes, and shapes each placed into artistic forms within the landscape. Larger rocks or boulders will be strategically placed to provide for interesting visual features or islands. Install artwork, signage/wayfinding, aesthetically designed fencing. |
Bridgeport Banner | Mono | 395 | Banner structure spanning US 395 at the intersection of the highway and Sinclair Street in the township of Bridgeport |
Fort Independence Lighting | Inyo | 395 | Install new lighting standards. |
Fort Independence Monuments | Inyo | 395 | Install new gateway monument. |
District 10 Project Portfolio (Alpine, Amador, Calaveras, Mariposa, Merced, San Joaquin, Stanislaus and Tuolumne Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Delta Region Sign Plan | San Joaquin | 12, 160 | Install wayfinding signs with a regionally significant theme. |
Plymouth Gateway & Trails | Amador | 49 | Install gateway monument at existing bicycle and pedestrian trail; add landscaped elements to the existing roundabout and trail. |
D10 Safety DO Complement | Merced, Stanislaus, San Joaquin | 4, 5, 99 | Install artistic panels on security fencing, paint murals, install decorative fencing, install art enhanced slope paving, etc. Install slope paving and decorative fencing around bridge structures. |
Calaveras Gateway & Wayfinding | Calaveras | 4, 49 | Install gateway monuments, wayfinding signage and low water use planting. |
Downtown Stockton Transformative Project | San Joaquin | 4 | Transform existing parking lot into community park. |
Ebbetts Pass Scenic Byway Signs | Calaveras, Alpine | 4, 89 | Install gateway monuments and wayfinding signs with a regionally significant theme. |
Mariposa Gateway | Mariposa | 140 | Install gateway monuments and wayfinding signs with a regionally significant theme. |
Merced Gateway & Mural | Merced | 99, 140, 59 | Install gateway monuments and wayfinding signs with a regionally significant theme. |
S. Modesto Visual Barrier | Stanislaus | 99 | Install a visual barrier along northbound SR 99, to provide a more visually appealing entrance to City of Modesto. |
Tuolumne County Corridor Enhancements | Tuolumne | 108 | Install aethetic treatments on bridge structures with a regionally appropriate design theme and a gateway monument at Parrots Ferry. |
District 11 Project Portfolio (Imperial and San Diego Counties) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
Boston Ave Linear Park | San Diego | 5 | Develop a pedestrian / bike path to serve the community of Barrio Logan; install meandering pedestrian/bike path, fencing and lighting. |
International Gateway for Calexico Port of Entry | Imperial | 7 | Install inert materials (boulders, rubble, cobble, gravel, decomposed granite) and low-maintenance, drought-tolerant specimen plant material (palms, trees, shrubs). |
Imperial County Community Improvements | Imperial | 86, 111, 115 | Install bus stop shelters/enhancements, pedestrian/solar shades, roadway median improvements, sidewalks and other pedestrian enhancements such as crosswalks and flashing beacons; add sidewalk, curb/gutter and ADA ramps. |
Downtown Ramona Community Improvements | San Diego | 67, 78 | Install enhanced textured and colored concrete paving of crosswalks; install radar speed signs; install audible traffic stripes for pedestrians as they support the shops and local businesses in the heart of the downtown district to capture the spirit of community. |
Vista Community Improvements | San Diego | 78 | Rehabilitate the existing roadside conditions including: removal of expired tree and shrub inventory; planting of trees and ground cover to replace the depleted inventory and provide additional tree canopy and coverage of the ground plane; install enhanced paving and other inert materials (boulders, rock blanket, cobble, gravel, decomposed granite). |
City Heights Community Enhancements | San Diego | 15 | Install artistic finishes on planters and banners on overhead structures. |
Downtown Art Installation | San Diego | 5 | Clean and install public art on walls along I-5 between 2nd Ave and 6th Avenue. |
Escondido Community Improvements | San Diego | 78 | Install gateway monument, landscape improvements at median, shoulder, non-paved vegetative areas; replace fencing; install decorative fence and upgraded pedestrian facilities to ensure safety and connectivity between roadway and trail. |
National City Community Improvements | San Diego | 805 | Construct pedestrian and bicycle trail paths; install lighting, an enhanced fence, enhanced paving, planting and irrigation, and pedestrian beautification elements to improve the appeal of the surrounding neighborhoods. |
Bridge Safety Enhancements | San Diego | Var | Install safety measures, such as securing bridge access points, fencing, slope paving and other hardscape elements. |
San Ysidro International Gateway | San Diego | 5, 805 | Replace existing entry monument 'Bienvenidos a California' (Welcome to California). The project will replace an existing monument, built in the early 1970's and currently in decline. The proposed project will include replacement of the existing CMU block structure and of existing vegetation with more sustainable plant material. It will include low-maintenance, drought tolerant plant material (palms, trees, shrubs, and ground cover) and complementary inert material (rock boulders, cobble, gravel, decomposed granite, and wood mulch). The scope will also include decorative accent lighting. |
District 12 Project Portfolio (Orange County) | |||
---|---|---|---|
Project Title | County | Route | Description of Work |
5/55 SSP LOT Beautification | Orange | 5, 55 | This project includes the Route 5/55 Interchange area and the First Street Caltrans Work Program parking lot. Upgrading access control with decorative fencing and gates around the parking lot and installing decorative paving, screen and improve the appearance of the parking lot. Low water landscaping around the parking lot, including trees. Local artwork will be added to the parking lot fence and areas within the project limits. Installation of decorative paving and/or gravel on unpaved slopes, in narrow areas and other locations. Installation of decorative fencing adjacent to and/or along local streets. Remediate areas near decorative features by removing weeds, trash, and debris, removing and/or pruning dead and overgrown shrubs and trees and, if needed, installing safety features to reduce illegal dumping, enhance water conservation through repairing and upgrading the existing irrigation systems. |
Rt 55/91 Beautification and Safety | Orange | 55, 91 | Install decorative paving and gravel in narrow areas, install low water ground cover, tree planting and mulch. Install decorative right of way fencing requested by the City. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, repair and upgrade the existing irrigation systems to help with water conservation, |
Rt 57/91 Beautification and Safety | Orange | 57 | Install decorative paving and gravel in narrow areas, install low water ground cover, tree planting and mulch. Installation of gateway monuments, and decorative fencing along local streets. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, repair and upgrade the existing irrigation systems to help with water conservation, |
Rt 91/5 Beautification and Safety | Orange | 5, 91 | Remove weeds, remove and/or prune dead and overgrown shrubs and trees, repair and upgrade the existing irrigation systems to help with water conservation, install decorative paving and gravel in narrow areas, install low water ground cover and mulch. Installation of gateway monuments, and decorative fencing along local streets. Plant trees. Install safety features to reduce illegal dumping. Refurbishing a pedestrian overcrossing. |
Art 57 Art | Orange | 57 | Installation of a decorative gateway monument with artistic features. Removing weeds, trash, and debris, landscaping and tree planting, enhance water conservation through repairing and upgrading the existing irrigation systems. |
Rt 22 Beautification | Orange | 22 | Creation of a mini pocket park along the Santiago Creek Bike trail in the city of Orange within vacant Caltrans property. This will include the installation of benches and decorative cleanup of the Caltrans parcel with ornamental security fencing and inert landscape materials that reflect the identity of the surrounding area. Decorative lighting features and landscaped elements consistent with the local active transportation plans would be added at the Springdale Street undercrossing. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, repair and upgrade the existing irrigation systems to help with water conservation, install decorative paving and gravel in narrow areas, install low water ground cover and mulch. |
Rt 73/5/55 Beautification | Orange | 5, 55, 73 | Installation of decorative paving, rock blanket, and/or gravel on unpaved slopes, in narrow areas and other locations and, installation of decorative fencing within the State Right of Way adjacent to and/or along local streets. Apply decorative staining to existing retaining walls and install a dedicated bike and pedestrian gate and path under Route 5 at El Horno Street. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, install decorative slope paving to control erosion near bridges and apply decorative staining to existing retaining walls and install mulch. |
Rt 91 Beautification and Safety | Orange | 91 | Installation of decorative paving and/or gravel on unpaved slopes, in narrow areas and other locations, installation of decorative fencing within the State Right of Way adjacent to and/or along local streets. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, install decorative paving and gravel in narrow areas and install mulch. The project proposes to install safety measures along the State Highway to help deter illegal dumping and access. |
Rt 405/55 Beautification and Safety | Orange | 55, 405 | Installation of decorative paving and/or gravel on unpaved slopes, in narrow areas and other locations, installation of decorative fencing within the State Right of Way adjacent to and/or along local streets. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, install decorative paving and gravel in narrow areas and install mulch. The project proposes to install safety measures along the State Highway to help deter illegal dumping and access. |
Rt 5 Beautification | Orange | 5 | Installation of decorative paving and/or gravel on unpaved slopes, in narrow areas and other locations, installation of decorative fencing within the State Right of Way adjacent to and/or along local streets. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, install decorative paving and gravel in narrow areas and install mulch. The project proposes to install safety measures along the State Highway to help deter illegal dumping and access. |
Rt 5/405 Beautification | Orange | 5, 405 | Installation of decorative paving and/or gravel on unpaved slopes, in narrow areas and other locations, installation of decorative fencing within the State Right of Way adjacent to and/or along local streets. Remove weeds, remove and/or prune dead and overgrown shrubs and trees, install decorative paving and gravel in narrow areas and install mulch. The project proposes to install safety measures along the State Highway to help deter illegal dumping and access. |
Rt 74/142 Safety | Orange | 74, 142 | Install safety measures along the State Highway to help deter illegal dumping and access. |